High-density palletized storage, cardboard packaging, and plastic shrink wrap create vertical fire flues where flames can climb 12-meter high racks within 90 seconds. We engineer Early Suppression Fast Response (ESFR) in-rack sprinkler systems, optical beam smoke detection across 100m warehouse spans, and heavy perimeter ring hydrants.
High-flow Early Suppression Fast Response sprinkler heads discharging high-momentum large water droplets capable of penetrating intense thermal fire plumes and suppressing high-stack pallet fires at ceiling heights up to 13.7 meters.
Piping routed directly inside multi-tier storage racks, placing quick-response sprinkler heads at intermediate shelf levels. Directly cools packaging and pallet loads where ceiling sprinklers cannot reach.
End-to-end reflective infrared beam detectors traversing 100-meter clear spans under high-bay roofs. Eliminates inaccessible spot detectors that cannot be serviced without cherry-picker lifts.
External 150mm heavy underground water mains encircling truck loading bays and parking yards. High-capacity ground monitors provide water stream reach across external staging areas.
Hydrogen gas detection sensors and clean agent automatic suppression systems in electric forklift and stacker battery charging rooms, preventing hydrogen ignition during overnight recharge cycles.
Dedicated 200,000 to 500,000 litre underground RCC static water reservoirs paired with dual 2850 LPM fire pump assemblies (Main Electric + Standby Diesel Engine) meeting NBC 2016 Part 4 mandates.
Contact our warehouse fire engineering division for hydraulic calculations, pipe routing CAD schematics, and turnkey installation.