INDUSTRIAL FIRE PROTECTION & COMPLIANCE PLATFORM

Absolute Compliance.
Zero Downtime.
Precision Fire Engineering.

Uttarakhand’s premier B2B fire safety engineering firm based in Haldwani. Turnkey hydrant networks, automatic sprinklers, clean agent gas suppression, certified IS 2190 hydrotesting, and Uttarakhand Fire NOC clearance across all 13 districts.

NBC 2016 Part 4
BIS Certified Equipment
13 Districts Coverage
IS 2190 Hydrotesting
Operational Status

Central Engineering Desk

HQ Workshop: Haldwani, Nainital Rd
Hydrotest Calibration: Certified to 35 Bar
Fire NOC Guidance: Uttarakhand Fire Act
Response SLA: < 4 Hours Escalation

Statutory verification for industrial plants, hotels & institutions.

Core Engineering Disciplines

Turnkey Fire Protection Systems for High-Risk Environments

Engineered per NBC 2016 Part 4 and Bureau of Indian Standards specifications.

ELECTRICAL & SERVER HAZARDS

Clean Agent & Gaseous Suppression

FK-5-1-12 FM-200 NFPA 2001

Total flooding and direct-to-panel fire suppression for mission-critical IT server racks, transformer bays, CNC machinery, and high-voltage MCC panels. Zero water damage, non-conductive, and residue-free.

EARLY WARNING PROTOCOLS

Intelligent Addressable Alarms

IS 2189:2014 EN54 Compliant

Multi-loop microprocessor addressable fire alarm panels, optical smoke detectors, rate-of-rise thermal sensors, beam detectors for high-ceiling warehouses, and IP-linked auto-dialer systems for 24/7 alerts.

Explore Detection Systems → Microsecond Pinpoint
HEAVY INFRASTRUCTURE

Hydrant & High-Flow Sprinklers

IS 3844:1989 IS 15105:2021

Turnkey engineering of industrial pump rooms (Main Electric, Standby Diesel, Jockey), heavy-gauge ERW C-Class wet risers, internal/external landing valves, and high-density automatic sprinkler arrays.

Turnkey Execution Framework

The 6-Stage Industrial Fire Engineering Lifecycle

From baseline hazard risk assessment to statutory Uttarakhand Fire Services NOC approval.

01

ASSESS

Comprehensive hazard classification per IS 14489 and fire load analysis of materials and structural envelope.

Stage 1: Vulnerability Audit
02

DESIGN

Hydraulic calculations, pump sizing, sprinkler spacing, and isometric riser drawings per NBC 2016 Part 4.

Stage 2: Technical CAD
03

INSTALL

Heavy C-Class ERW piping, grooved couplings, BIS pumps, alarm cabling, and suppression cylinder banks.

Stage 3: On-Site Piping
04

TEST

Hydrostatic pressure testing at 1.5x working pressure for 24 hours, flow rate verification, and alarm dry runs.

Stage 4: Commissioning
05

MAINTAIN

Quarterly AMC audits, monthly pump runs, IS 2190 hydrotesting, chemical refilling, and emergency response.

Stage 5: AMC Lifecycle
06

DOCUMENT

Test reports, Form-B certifications, compliance logbooks, and liaison for Uttarakhand Fire NOC clearance.

Stage 6: Statutory NOC
Interactive Statutory Tool

Fire Protection Planning Calculator & Estimation Engine

Compute your baseline statutory equipment requirements per NBC 2016 Part 4, IS 15683, IS 3844, and IS 15105.

Facility Parameters

Baseline Engineering Scope (Estimated):

Portable Extinguishers (IS 15683): 7 Units (5 ABC + 2 CO₂)
Hydrant Valves & Riser (IS 3844): 6 Landing Valves + Hose Boxes
Automatic Sprinklers (IS 15105): Approx. 136 Sprinkler Heads
Intelligent Alarms (IS 2189): 34 Detectors + 6 MCP Units
Statutory Fire NOC Compliance Status:
MANDATORY (NBC 2016 Part 4 Uttarakhand Fire Services Act)
Direct Engineering Proposal Desk

Request Technical Bid & Site Audit

Fill your specifications below. Logged to our compliance database with an official Lead ID.

1 Facility
2 Systems
3 Timeline
4 Contact
Industrial Equipment Catalog

BIS & NBC Certified Fire Protection Equipment

Precision-engineered for Uttarakhand climatic conditions and industrial applications.

View Complete Product Range →
IS 15683 CLASS A:B:C:E

Portable Fire Extinguishers

ABC MAP-50 powder, CO₂ high-pressure seamless cylinders, Mechanical Foam (AFFF), and Clean Agent FK-5-1-12.

IS 3844 / IS 5290 PN 16 RATED

Hydrant & Wet Riser Hardware

Gunmetal single & double landing valves, reinforced rubber lined (RRL) hoses, branch pipes, and 4-way fire brigade breeching inlets.

IS 15105 / UL QUICK RESPONSE

Automatic Sprinkler Heads

Pendent, upright, sidewall, and concealed glass-bulb heads (68°C / 79°C), alarm check valves, and water motor gongs.

IS 2189 / EN 54 ADDRESSABLE

Intelligent Alarm Panels

Multi-loop addressable control panels, optical dual-wavelength smoke detectors, thermal heat sensors, and addressable sounder beacons.

Technical Services Desk

Turnkey Fire Engineering, Maintenance & NOC Compliance

We handle everything from statutory compliance blueprints to on-site testing and annual maintenance contracts.

IS 2190 Refilling & Hydrotesting

State-of-the-art hydraulic testing up to 35 bar in our Haldwani facility. Complete discharge, internal inspection, certified chemical refilling, and authorized pressure test certificate.

Learn More → 24-Hr Turnaround

Uttarakhand Fire NOC Guidance

Full technical guidance for Fire Safety Certificate (NOC) applications, renewals, hydraulic pump calculations, riser isometric drawings, and on-site departmental inspection coordination.

Learn More → NBC 2016 Part 4

Comprehensive AMC & 24/7 Support

Scheduled quarterly functional testing of pump rooms, hydrant valves, alarm panels, and sprinkler arrays with SLA-backed priority breakdown engineering across Uttarakhand.

Learn More → Priority SLA
Tailored Hazard Protection

Industry-Specific Fire Protection Engineering

Every sector has distinct combustion characteristics, evacuation profiles, and statutory codes.

Hotels & Hill Resorts

Sub-zero freeze protection for wet risers, concealed aesthetic sprinklers, addressable bedroom sounders, and commercial kitchen wet chemical hood systems.

Explore Hospitality Solutions →

Chemical & Pharma Manufacturing

Flame-proof explosion-protected detectors, foam deluge systems for solvent storage, high-pressure hydrants, and Class B fire suppression.

Explore Industrial Solutions →

Hospitals & Clinical Centers

ICU smoke-free compartmentalization, oxygen plant deluge protection, phased evacuation alarms, and medical gaseous suppression.

Explore Healthcare Solutions →

Server Rooms & Data Hubs

Novec 1230 / FM-200 clean agent total flooding, VESDA high-sensitivity aspiration smoke detection, and abort switch interlocks.

Explore Server Room Solutions →

Warehouses & High-Bay Logistics

Early Suppression Fast Response (ESFR) in-rack sprinklers, linear beam smoke detection across 100-meter bays, and peripheral hydrants.

Explore Logistics Solutions →

Commercial Complexes & Malls

Multi-zone public address voice evacuation (PAVA), smoke extraction ventilation dampers, automatic fire curtains, and wet riser landing valves.

Explore Commercial Solutions →
Statewide Deployment Footprint

Serving All 13 Districts of Uttarakhand

Headquartered in Haldwani with dedicated mobile engineering and hydrotesting logistics across Kumaun and Garhwal.

Technical & Statutory Knowledge

Frequently Asked Questions on Uttarakhand Fire Safety & NOC

Authoritative guidance on National Building Code (NBC 2016 Part 4) and Indian Standards.

Under National Building Code (NBC 2016 Part 4) and Uttarakhand Fire Services regulations, any commercial, educational, hospitality, or industrial facility exceeding 15 meters in height, or with built-up area exceeding 500 sq meters, requires a dedicated fire hydrant/wet riser system (IS 3844), automatic sprinkler protection (IS 15105), addressable fire alarms (IS 2189), portable extinguishers (IS 15683), and a certified dedicated fire water storage tank with main, standby diesel, and jockey pumps.
Statutory Protection Desk

Ready to Secure Your Industrial Plant, Hotel, or Commercial Facility?

Speak directly with a licensed fire protection engineer or request a statutory site audit today. Fully certified per NBC 2016 Part 4 and Uttarakhand Fire Services Act.

Call Desk: +91 5946 222 223
Central Office: Opp Female Hospital, Nainital Road, Haldwani, Uttarakhand – 263139
Call Desk 05946 222 223